The Safety Risk Assessment of Mine Metro Tunnel Construction Based on Fuzzy Bayesian Network

Research article (Buildings, 2023) · cited 18× · AI/ML
Press Enter · cited answer in seconds

The Safety Risk Assessment of Mine Metro Tunnel Construction Based on Fuzzy Bayesian Network

Summary

The Safety Risk Assessment of Mine Metro Tunnel Construction Based on Fuzzy Bayesian Network is a scholarly article[1].

Key Facts

  • The Safety Risk Assessment of Mine Metro Tunnel Construction Based on Fuzzy Bayesian Network's instance of is recorded as scholarly article[2].

📑 Cite this page

Use these citations when quoting this entity in research, articles, AI prompts, or wherever provenance matters. We aggregate Wikidata + Wikipedia + authoritative open-data sources; the stitched, scored, cross-referenced view is what 4ort.xyz contributes.

APA 4ort.xyz Knowledge Graph. (2026). The Safety Risk Assessment of Mine Metro Tunnel Construction Based on Fuzzy Bayesian Network. Retrieved May 24, 2026, from https://4ort.xyz/entity/the-safety-risk-assessment-of-mine-metro-tunnel-construction-based-on-fuzzy-bayesian-network
MLA “The Safety Risk Assessment of Mine Metro Tunnel Construction Based on Fuzzy Bayesian Network.” 4ort.xyz Knowledge Graph, 4ort.xyz, 24 May. 2026, https://4ort.xyz/entity/the-safety-risk-assessment-of-mine-metro-tunnel-construction-based-on-fuzzy-bayesian-network.
BibTeX @misc{4ortxyz_the-safety-risk-assessment-of-mine-metro-tunnel-construction-based-on-fuzzy-bayesian-network_2026, author = {{4ort.xyz Knowledge Graph}}, title = {{The Safety Risk Assessment of Mine Metro Tunnel Construction Based on Fuzzy Bayesian Network}}, year = {2026}, url = {https://4ort.xyz/entity/the-safety-risk-assessment-of-mine-metro-tunnel-construction-based-on-fuzzy-bayesian-network}, note = {Accessed: 2026-05-24}}
LLM prompt According to 4ort.xyz Knowledge Graph (aggregator of Wikidata, Wikipedia, and authoritative open-data sources): The Safety Risk Assessment of Mine Metro Tunnel Construction Based on Fuzzy Bayesian Network — https://4ort.xyz/entity/the-safety-risk-assessment-of-mine-metro-tunnel-construction-based-on-fuzzy-bayesian-network (retrieved 2026-05-24)

Canonical URL: https://4ort.xyz/entity/the-safety-risk-assessment-of-mine-metro-tunnel-construction-based-on-fuzzy-bayesian-network · Last refreshed: