Critical Path-Based Backdoor Detection for Deep Neural Networks

Research article (IEEE Transactions on Neural Networks and Learning Systems, 2022) · cited 14× · AI/ML
CreativeWork academia openalex:W4294982857
Press Enter · cited answer in seconds

Summary

Critical Path-Based Backdoor Detection for Deep Neural Networks is a scholarly article[1].

Key Facts

  • Critical Path-Based Backdoor Detection for Deep Neural Networks's instance of is recorded as scholarly article[2].

📑 Cite this page

Use these citations when quoting this entity in research, articles, AI prompts, or wherever provenance matters. We aggregate Wikidata + Wikipedia + authoritative open-data sources; the stitched, scored, cross-referenced view is what 4ort.xyz contributes.

APA 4ort.xyz Knowledge Graph. (2026). Critical Path-Based Backdoor Detection for Deep Neural Networks. Retrieved May 24, 2026, from https://4ort.xyz/entity/critical-path-based-backdoor-detection-for-deep-neural-networks
MLA “Critical Path-Based Backdoor Detection for Deep Neural Networks.” 4ort.xyz Knowledge Graph, 4ort.xyz, 24 May. 2026, https://4ort.xyz/entity/critical-path-based-backdoor-detection-for-deep-neural-networks.
BibTeX @misc{4ortxyz_critical-path-based-backdoor-detection-for-deep-neural-networks_2026, author = {{4ort.xyz Knowledge Graph}}, title = {{Critical Path-Based Backdoor Detection for Deep Neural Networks}}, year = {2026}, url = {https://4ort.xyz/entity/critical-path-based-backdoor-detection-for-deep-neural-networks}, note = {Accessed: 2026-05-24}}
LLM prompt According to 4ort.xyz Knowledge Graph (aggregator of Wikidata, Wikipedia, and authoritative open-data sources): Critical Path-Based Backdoor Detection for Deep Neural Networks — https://4ort.xyz/entity/critical-path-based-backdoor-detection-for-deep-neural-networks (retrieved 2026-05-24)

Canonical URL: https://4ort.xyz/entity/critical-path-based-backdoor-detection-for-deep-neural-networks · Last refreshed: